Medium-stay flex living next to the A-6

Description

A flex living aparthotel, with part of the units set aside for short stays. The product centres on the one-bedroom apartment, complemented by studios and two-bedroom apartments.

Built on footings and reinforced-concrete piles adapted to the site's geotechnics, with a concrete structure on columns and slabs optimised to gain free height, and a ventilated façade of wood-finish aluminium panels over an ETICS system. The spaces are adapted for people with reduced mobility and the project is pursuing BREEAM certification, prioritising energy efficiency and sustainable design.

Beyond the included amenities, the operator offers pay-per-use services such as cleaning, towel changes, an additional parking space or pet admission.

Services and amenities

Sport and wellness

  • Gym
  • Rooftop pool

Shared spaces

  • Rooftop
  • Landscaped terraces
  • Social club
  • BBQ
  • Meeting room

Building services

  • Laundry
  • Garage
  • Storage room
  • Maintenance

Asset location

In Valdemarín (Moncloa-Aravaca), right by the A-6

Clean aerial view of the Inversiones Valdemarín surroundings with the plot marked, next to the A-6 motorway and the M-40
Valdemarín (Moncloa-Aravaca) · direct connection to the A-6 and the M-40

Investment timeline

From land to exit

  1. Milestone 01

    Land purchase

    Acquisition of the land and start of the investment.

  2. Milestone 02

    Permit

    Application for and obtaining of the building permit.

  3. Milestone 03 · In progress

    Building works

    Start and execution of the works on the medium-stay flex living aparthotel.

  4. Milestone 04

    Works completion and final certificate

    Completion of the works and obtaining of the final works certificate.

  5. Milestone 05

    Income stabilisation

    Start of operation — expected in 2027 — and maturing of occupancy and rents.

  6. Milestone 06

    Possible exit

    Divestment expected once the asset is stabilised.

Closed vehicle · Under construction

Valdemarín is no longer open to new investors

The vehicle is closed to new co-investors and currently under construction. If you are considering a co-investment, Cesaraugusta Prime — prime rental in Zaragoza — is still open: we will walk you through the assumptions, risks, structure and terms in its investment memorandum.